Skip to main content
Skip table of contents

Production Times

In this tab we need to press the button :Add: to display the screen with parameters for setting the production times for material.

In the below table there are all parameters of the Material, tab Production times with its description.

Parameter name

Limitations

Possible values

Description

DB field

Production line

defined values

The list of all production lines available selection

The selection bar of all available production lines for which we can assign the material.

[MATERIAL_GROUP_CHANGEOVER].[ID_PRODUCTION_LINE]

Production time calculation model

defined values

  • Any quantity

  • Per produced unit

  • Any quantity: The production time is independent of the quantity of the Production Item.

  • Per produced unit: The production time is defined to produce 1 unit, and the production time of the Production Item is a multiplication of this time and the quantity in the Production Item.

[SHIFT_MATERIAL_PRODUCTION_TIME].[TIME_PRODUCTION]

Picking priority

0 or positive number

-

Picking priority within internal logistics - removal of finished products from the line

[PRODUCTION_LINE].[line_scheduling]

Number of production items in a loop

0 or positive number

-

Number of production items within one cycle of material removal from the line (Internal logistics).

[MATERIAL_WORKSPACE_REL].[PRODUCTION_ITEMS_IN_LOOP]

Batch size

0 or positive number

-

The number that defines the size of a batch.

[MATERIAL].[BATCH_SIZE]

Default line

checkbox

on / off

Enables/disables the line as a default line for production from the material during autoassignment process.

[MATERIAL_PRODUCTION_TIME].[default]

Active

checkbox

on / off

Enables/disables the line as a active line for production from the material - it is not possible to assign Production Item to deactivated Material-Production Line relation.

[PRODUCTION_LINE].[active]

Operators

0 or positive number

-

The number of operators who process 1 unit of material in a given time.

[INBOUND_DELIVERY_MATERIAL].[ID]

Production time

HH:MM:SS

-

Duration of production of 1 unit of material for a given number of operators per shift.

[PRODUCTION_LINE].[final_production_time_type]

It is possible to define multiple production lines on which this material can be processed.

JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.