The production line preview is comprised of multiple tabs, each providing access to different information or functionality relevant to the production process. Access to these tabs can be customized on an individual basis, ensuring that each team member has access to the information and tools they need to perform their job effectively.
Production item detail
Production item info
Outbound delivery
Customer
Other
Production item
Material
Material title
Quantity (total)
Quantity (bad)
Quantity (finished)
Required production finish
Delivery number
Quantity
10. Status 11. Scheduled finish time 12. Scheduled delivery time 13. Truck image 14. Sales agreement
15. Sold to 16. Ship to
17. Parent production item 18. Handling unit template = how the material should be packed. 19. Barcode = barcode field. 20. Material description 21. Production line = on which we distributed the material 22. Production version 23. User finished 24. Created = creation date 25. Send to Redbox 26. Delete item
The button :Change: allows us to change the data.
User comments
Provides a way for authorized users to add notes or feedback related to a specific production item. These comments can include information such as quality control results, production issues, or suggestions for improvement.
Linked production items
Production item that is associated or connected with another item in the production process:
BOM
In the tab BOM of the produciton item detail, we can view this tab by two ways. We can select these options in the selection bar 'Display option' by selection one of the two options:
Graph
Table
By selection ‘Graph’ we get this kidn of view of the BOM:
Information in Graph.
Specific materials
By selection ‘Table’ we get this kidn of view of the BOM:
Information in table
Specific materials
Production tools
Operational Buttons:
:Add: - To add a new equipment
:minus_delete: - to delete a row with the equipment
Warehouse material
Warehouse material can be sorted by these data:
ID
Location
Batch
Batch created
Stock/reserved
quantity (bad)
Status
On the warehouse material detail we can see:
List of warehouse items.
The button :Customize_Table: opens the Layout for this data table.
With the button :Export: the software will generate an Excel file containing all the data that is currently being displayed on your screen. This can be useful if you need to analyze or manipulate the data in Excel or if you need to share the data with others who do not have access to the software you are using.
Print all data with the button :Printall:
Constumption
Consumption refers to the use or depletion of materials, components, or resources during the production process. It can refer to the amount of raw materials used to make a product, the energy consumed during production, or the time required for production. Understanding consumption is important for effective production planning and inventory management, as it helps to ensure that the necessary resources are available when needed and that waste is minimized.
When clicked, a list of stock items from which I can produce will be displayed.
Characteristics
Declaration from planning module
If the parameter "Allow manual finish in planning module" is set in the settings of the production line where the given Production item is assigned, a menu will appear in the upper right corner of the dialog. Here it is possible to declare the production of this Production Item at the moment when its production has already started. A declaration made in this way will end production of the item in exactly the condition and quantity in which it is currently found. Therefore, if an incomplete quantity was declared, it is necessary to count on the fact that exactly such a quantity will be stored for the item without the possibility of reproducing it within this Production Item.
Split Production Item
If the Production Item is in Redbox (including Incomplete), a "Split Production Item" button will appear in the upper right corner of the dialog.
Pressing the button causes Production Item to divide into two separate Production Items and the following situations can occur:
A quantity has already been declared for the Production Item (most often when in Incomplete). In that case, the already declared quantity will be placed in one Production Item and its declaration will be made immediately - i.e. the declared quantity will be finished. The remaining (undeclared) quantity will be in the second PI and will still be in the redbox.
If no quantities have been declared yet, the Production Item will be split equally into 2 and both will still be in the redbox.
All properties of the Production Item are preserved, including the BOM. If this Production Item has linked sub-Production Items under it according to the BOM, these sub-items are also divided proportionally.
JavaScript errors detected
Please note, these errors can depend on your browser setup.
If this problem persists, please contact our support.